Skip to content
SOLVENCY
Request a demo

Account controls are loading.

Head to head

Hy3vsStep 3.5 Flash

For tasks, about a month.

Verdict · measured basis

Hy3 costs $0.0020 per solved task against Step 3.5 Flash at $0.0031▼ 1.5x cheaper. Over 200 tasks that is $0.21 a month.

On output token price alone Step 3.5 Flash looks 1.1x cheaper. The ranking reverses once you divide by pass rate — the cheaper tokens do not win the task.

Verified pricing, pass rate and cost per solved task for Hy3 and Step 3.5 Flash
FigureHy3Step 3.5 Flash
Input $/Mtok$0.083$0.1
Output $/Mtok$0.33$0.3
Cached input $/Mtok$0.021$0.1
Pass rate67%50%
Cost per solved task$0.0020measured$0.0031measured
Cost per month$0.41$0.62

Cost per month against tasks per month · drag the marker

Monthly cost against tasks per monthLog-log lines for Hy3 (measured, $0.0020 per solved task), Step 3.5 Flash (measured, $0.0031 per solved task) from 10 to 100,000 tasks a month. Marker at 200 tasks.101001k10k100k$0.1$1$10$100TASKS / MONTH (log) →200 tasksHy3 · MEASURED · $0.0020 per solved task$0.41Step 3.5 Flash · MEASURED · $0.0031 per solved task$0.62— Hy3 · MEASURED— Step 3.5 Flash · MEASURED

Solid measured · dashed modeled · dotted stale. The gap is the verdict.

Solvency Bench (solvency.dev) — first-party measurement · verified 2026-08-26 · prices from each provider's pricing page; measured rows ignore the tier · Methodology · All models at these settings